The Swale & Ure Internal Drainage Board has one pumping station within the District at Maunby, known as Spudling Dyke.

Spudling Dyke pumping station was constructed in 1978 by the Board to maintain a satisfactory water level within the 120ha catchment it serves. Watercourses within the catchment were significantly improved and were also part of the scheme which was grant aided by MAFF.

The pumping station consists of a single Archimedean screw with the inlet invert at 20.10 m Above Ordnance Datum (AOD) and delivery invert at 23.20m AOD. The screw is 1200mm in diameter and 8.0m in length. Its design output is 250l/s and discharges into the River Wiske.

For the financial year 2018-19 the pump has operated a total of 958 hours.

Our Pumping Station

Name of Pumping StationCatchment Area (Ha.)No. of PumpsOutput (l/s)TypeInlet Invert (AOD)Delivery Invert (AOD)
Spudling Dyke1201250Archimedean Screw20.10m23.20m

About us

welland-svg_icon-hp-got-question

Got a question about our drainage network?

If you need further information please look at our frequently asked questions.

welland-svg_icon-contact-box

For more information about our services or district call us

Thirsk –
01845 525727

Knaresborough –
01423 862271

or
07970 000068